Sunday, December 19, 2010

Basment's Soon Set

I hauled down 1,600 lbs of Quikrete to fill in my basement floor. About the same mass of material went up too. Studs are up, plumbing rough-in is about done, floors filled in.

Still need to get the electrician in, have my guys put up the drywall, have the plumber finish up; then I'll put linoleum down, finish the dry wall and paint. After that it will just be some trim jobs.

A lot of work, but, so far, we're under budget. I've also made sure that I have a good place to sit and watch the Vikes play at the Gopher's stadium.